View and Edit Installation Detail Drawing Details
- Last UpdatedJul 15, 2025
- 2 minute read
To edit or view existing Installation Detail Drawing information, select the drawing in the Installation Detail Drawings List and click Edit on the Home tab, or double-click on the drawing record in the Installation Detail Drawings List. The Installation Detail Drawing Information window is then displayed:

Note:
The Last Edit field displays the date and time when the Installation Detail drawing data was last
edited. The user name of the individual that performed the edit is displayed in a
tool-tip when the mouse cursor is hovered over the field. Click the button in the
field to display the Audit Manager, which will display a list of all the changes to the Installation Detail drawing
data.
This window is identical to the normal Drawing Information window (see Add New Drawings) except it has two additional tabs:
|
Template |
Used to select the Installation Template to be used when creating the Installation Detail Drawing. See Assign an Installation Detail Template. |
|
Tags |
Used to assign tags to the current Installation Detail Drawing. See Assign Tags to an Installation Detail Drawing. |
Reassign a Tag Position in a Installation Detail Drawing
Select a tag and drag it into a new position.
The example below shows four tags.

Drag the second tag and "drop" it onto the first position to move the selected tag to that position.

This will automatically move all tag data on the corresponding Installation Detail drawing to the new positions next time the drawing is updated.
Remove a Tag from a Installation Detail Drawing
Select a tag and click Un-Assign.
Note:
Removing a tag does not delete its data. It only unassigns the tag from the drawing.
Pack Tags
If tags are removed and gaps appear in the list of assigned tags, the tags can be "packed" using the Pack Tags button. This removes the gaps: tags are moved up the list to remove them. Packing tags also re-sorts the order based on the tag number.