Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Electrical

Installation Detail Reports

  • Last UpdatedJul 15, 2025
  • 2 minute read

Three reports related to Installation Details are available in Electrical Designer:

  • BOM/Material Take Off

  • Equipment Assigned

  • Equipment not yet Assigned

These are accessed from the Fixed Reports list accessed from the Reports grid.

The BOM/Material Take Off report lists the Installation Detail items that comprise the project Bill of Materials.

The report is displayed in the Installation Detail Bill of Materials window:

An item is added to the BOM by assigning it to an Installation Detail drawing and unchecking its No. checkbox (see Assign Tags to an Installation Detail Drawing).

The Equipment Assigned report lists the equipment assigned to Installation Detail drawings in the project:

The Equipment not yet Assigned report lists the equipment not yet assigned to Installation Detail drawings in the project:

Only equipment that is pre-assigned via an Installation Detail type (Template) are listed.

For descriptions of the toolbar buttons of the Equipment Assigned and Equipment not yet Assigned report windows, refer to Reports.

TitleResults for “How to create a CRG?”Also Available in