Packages List
- Last UpdatedJul 23, 2025
- 2 minute read
The Packages list is the main window for adding/editing equipment packages in your project and for assigning equipment to them. The viewable columns, their captions, column size and order are user definable using the Grid Manager utility.
Access the Packages List
To open the Packages list, click Select in the Grids and Schedules section of the Home tab.
Select Packages from the list of grids that is then displayed. The Packages list grid is then displayed:

Refer to Working with the Data Grid for information on the grid controls including selecting a record, and sorting and filtering the grid data.
The Packages list consists of two grids. The main, upper grid displays general details of the packages in the project. The lower grid displays details of any equipment assigned to the package currently selected in the upper grid.
To edit data in either grid the user can either double-click on a record, or to edit a package record, select it and click Edit on the Home tab. The user can also edit most column data directly in the grid itself by selecting the cell and entering a new value, selecting a value from a pick list etc. Columns with a yellow coloured background cannot be edited directly in the grid.
Grid PickLists
Some grid cells contain picklists. The value lists in each pick list are generally loaded from both the PickList library, plus any value that has been entered into the pick list's field. Therefore manually adding a value into the pick list will add that new value to the picklist for future use.
Note:
A pick list may be set so that grid cells must be completed with the values in it,
that means other values may not be manually entered.
Note:
Any value manually added directly into a grid pick list does not get added to the
picklist's value list until the Refresh toolbar command is used or the grid is re-loaded (for example, Electrical Engineer is re-started).
Refer to Using PickLists for further information on editing pick lists.