Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Electrical

Auto Cross Patching Procedure

  • Last UpdatedAug 04, 2025
  • 1 minute read

From the Terminations window:

  1. Select Cross Patch from the Wiring tab.

  2. AVEVA Electrical will then display the Select Equipment window, listing of all equipment in the current location:

    Auto Cross Patch wiring will take place between the current equipment in the Terminations window and the target equipment selected from the above window. The first item in this list is always the equipment tag that is the current focus of the Terminations window.

  3. To select the target equipment, double-click on it.

  4. Electrical Wiring Manager will then process all possible wire terminations between every terminal in all terminal strips, devices and I/O modules in each of the current and Target equipment. Electrical Wiring Manager compares each terminals signal number to all others in the Target equipment. If a match is found a new wire is created and terminated on both the matching terminals. This process is repeated again until all possible wires are added.

  5. To cancel cross patch wiring click the close button to close the window.

TitleResults for “How to create a CRG?”Also Available in