AVEVA Production Accounting tutorial
- Last UpdatedFeb 28, 2025
- 1 minute read
This section explains how to build a new model in AVEVA Production Accounting. This tutorial gives step by step instructions for each stage of the process. It is divided into sections, each of which takes you through a stage of the model building process.
In this example tutorial , instead of drawing data from a plant historian via an interface with tags, we shall, for simplicity, enter the numeric flow values by hand.
The model you will build in this section is identical to the test model installed with new releases of AVEVA Production Accounting.
Related Links
- Launch AVEVA Production Accounting
- Create a new database
- Create a new model
- Specify the engineering unit
- Set the period
- Create a flowsheet
- Define the static data for each stream
- Input the measured flow into each stream object and tank
- Run reconciliation
- Check the results
- Create new events using Select Period
- Add a process loss stream using smart objects
- Add shipment loss stream using minimum range constraint
- Add an unmeasured stream using minimum constraint
- Add a model connector to link models
- Satisfy component balance by adding smart constraints
- Add a logical model to summarize the balance models