Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

Everything E3D

Pipe Ends and Connections

  • Last UpdatedAug 22, 2025
  • 2 minute read

Pipe ends will normally have specific text messages plotted next to them under the following circumstances:

  • At the start of a Pipe.

  • At the end of any type of off-line Branch.

  • At the end of a Pipe.

These messages show how the Pipe is continued from that point onwards, or any special Pipe end condition that may be required, as shown in the following examples.

Full E-W, N-S and elevation (EL) coordinates will be listed for the start and finish of each Pipe. They will also be listed at the end of every Tee off-line branch; in other words, at all connection points.

Where a Pipe is connected to another Pipe, the coordinates will be preceded by a CONT. ON message. In Figure 6:18.: Information at an end of a pipe connected to another pipe, a Branch of PIPE-36A is the HREF or TREF of the Pipe shown.

Information at an end of a pipe connected to another pipe

All changes in elevation will be marked at the first intersection point after the new elevation occurs.

Detailing a change of elevation