Pipe Ends and Connections
- Last UpdatedAug 22, 2025
- 2 minute read
Pipe ends will normally have specific text messages plotted next to them under the following circumstances:
-
At the start of a Pipe.
-
At the end of any type of off-line Branch.
-
At the end of a Pipe.
These messages show how the Pipe is continued from that point onwards, or any special Pipe end condition that may be required, as shown in the following examples.
Full E-W, N-S and elevation (EL) coordinates will be listed for the start and finish of each Pipe. They will also be listed at the end of every Tee off-line branch; in other words, at all connection points.
Where a Pipe is connected to another Pipe, the coordinates will be preceded by a CONT. ON message. In Figure 6:18.: Information at an end of a pipe connected to another pipe, a Branch of PIPE-36A is the HREF or TREF of the Pipe shown.

Information at an end of a pipe connected to another pipe
All changes in elevation will be marked at the first intersection point after the new elevation occurs.
Detailing a change of elevation