Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

Everything E3D

Prepare the Site for Spool

  • Last UpdatedNov 19, 2025
  • 1 minute read

The consistency of the data should have been checked before the model is sent for spooling. However, it is best practice to check that the design data in the design model is consistent and make any changes (inserting shop or field welds) to the design model that are obviously needed after inspection, before any spooling is carried out.

The SPOOL module does not operate correctly if there are errors in the consistency check, warnings do not affect the operation. Make sure the ZONE SPOOL-PIPE element in the Model Explorer is the CE.

Refer to Data Consistency for further information.

Related Links