Problem description for the U5 example simulation
- Last UpdatedSep 20, 2024
- 1 minute read
A chemical plant is expanding its fire water network (see the figure in Summary for the U5 example simulation) to cover new process facilities. The total flow capacity in the water network needs to be increased from 0.126 m3/s (2000 gpm) to 0.158 m3/s (2500 gpm).