Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Process Simulation

Results for the CC25 example simulation

  • Last UpdatedSep 19, 2024
  • 1 minute read

In the following figure, the Economic Summary model shows the utility costs for the process before and after optimization.

Figure 5: Economic summary before (left) and after (right) optimization

AVEVA Process Simulation simultaneously optimizes over multiple process specifications to find an ideal operating point that offers the greatest cost savings. After optimization, we decrease the operating cost of the process from $1320/h to $920/h (a savings of over $3MM per year) while still maintaining product flowrates and specifications.

TitleResults for “How to create a CRG?”Also Available in