Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Process Simulation

Process description for the U5 example simulation

  • Last UpdatedSep 20, 2024
  • 1 minute read

The fire water supply temperature is 25.5°C (78°F) and pressure is 2170 kPa (300 psig).

In the revamped network, all fire water delivery points will have a minimum flow requirement of 0.0158 m3/s (250 gpm) and a minimum pressure requirement of 1032 kPa (135 psig).

Details of the fire water delivery points are as follows:

Existing Delivery Points

SNK1, SNK2, SNK3, SNK4, SNK7, SNK8, SNK9, SNK10

New Expansion Delivery Points

SNK5, SNK6

The fire water pumping station will take care of additional fire water flow requirements.

Details of existing pipe network are as follows:

Pipe

Size NPS (in.)

Schedule

L (m)

DE (m)

PIPE1

6

40

30

0

PIPE2

6

40

30

0

PIPE3

6

40

91

0

PIPE4

6

40

305

0

PIPE5

4

40

152

0

PIPE9

4

40

152

0

PIPE10

6

40

305

0

PIPE11

4

40

152

0

PIPE12

6

40

914

0

PIPE13

3

40

91

0

PIPE14

3

40

91

0

PIPE15

3

40

91

0

PIPE16

3

40

91

0

PIPE19

3

40

91

0

PIPE20

3

40

91

0

PIPE21

3

40

91

0

PIPE22

3

40

91

0

TitleResults for “How to create a CRG?”Also Available in