Process description for the U2 example simulation

  • Last UpdatedSep 19, 2024
  • 1 minute read

The following figure shows the steam turbine power plant. Two feed valves provide steam to a steam header, which supplies steam to a back pressure steam turbine. A pressure controller on the header operates the steam turbine governor to maintain a constant header pressure.

Embedded Image (65% Scaling) (LIVE)

The following table summarizes the design parameters of the plant.

Model

Variable

Value (SI)

Value (US Refining)

Feed1

T

550 K

990 R

Feed2

T

560 K

1008 R

Feed1 and Feed2

P

5000 kPa

725.2 psi

Feed1 and Feed2

W

30 kg/s

66.1 lb/s

H1

P

4500 kPa

652.7 psi

H1

ResidenceTime

20 s

20 s

XV2 and XV2

ManPos

90%

90%

T1

eta (efficiency)

75%

75%

PC1

OP (PID output)

90%

90%

Product

P

2000 kPa

290.1 psi