Summary for the SS1 example simulation

  • Last UpdatedSep 19, 2024
  • 1 minute read

This example simulation demonstrates a small renewable energy grid. Two wind farms and three solar farms supply power to the grid. The Process mode simulation represents the power output at average conditions. The simulation includes an additional scenario that uses 15-minute wind and solar resource data to calculate the total power output throughout the day. For simplification, we assume that the Production facility requires a constant 0.8 MW of power. We sell the remaining power to other local facilities (LocalGrid).

The following figure shows the renewable energy grid modeled in AVEVA Process Simulation.

Figure 1: A small renewable energy grid in AVEVA Process Simulation