Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Process Simulation

Summary for the U3 example simulation

  • Last UpdatedSep 19, 2024
  • 1 minute read

Steam distribution systems found in refineries and large petrochemical complexes are complex and highly integrated systems with multiple pressure levels. The objective of this simulation is to:

  • Provide a steam balance to show the steam generation required to satisfy the electrical power demand and the process steam consumption.

  • Size piping to meet steam delivery pressures at the steam consumers.

  • Validate the process control strategy by showing how the controls respond in the event of an upset, such as a trip of a steam turbine.

    The following figure illustrates the refinery steam distribution system as modeled in AVEVA Process Simulation.

TitleResults for “How to create a CRG?”Also Available in