Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Process Simulation

Scenarios for the GG1 example simulation

  • Last UpdatedSep 19, 2024
  • 2 minute read

Scenario 1: Motor trip with a cold recycle anti-surge valve

Run the Motor Trip with Cold Recycle Scenario. This Scenario trips motor M1 after 5 seconds.

Embedded Image (65% Scaling) (LIVE)

Scenario 2: Blocked outlet with a cold recycle anti-surge valve

Run the Blocked Outlet with Cold Recycle Scenario. This Scenario closes outlet valve XV2 after 5 seconds.

Scenario 3: Motor trip with a hot recycle anti-surge valve

Run the Motor Trip with Hot Recycle Scenario. This Scenario trips motor M1 after 5 seconds.

Scenario 4: Blocked outlet with a hot recycle anti-surge valve

Run the Blocked Outlet with Hot Recycle Scenario. This Scenario closes outlet valve XV2 after 5 seconds.

In This Topic
TitleResults for “How to create a CRG?”Also Available in