Summary for the U7 example simulation
- Last UpdatedSep 20, 2024
- 1 minute read
Refinery steam systems require steam balances.
The objective of this simulation is to:
-
Create an initial steam balance for a typical refinery steam system that contains steam at three different pressure levels:
-
High pressure (HP)
-
Middle pressure (MP)
-
Low pressure (LP)
-
-
Demonstrate how to model the deaerator and close the condensate and boiler feedwater loop.
-
Create sequence logic that sets the priority of letdown valves, steam turbines, and turbine extraction valves to meet a wider range of process steam demand.
-
Create alternative cases where the steam sequence logic automatically changes the letdown valve and steam turbine operation to satisfy the steam balance.
-
Demonstrate how to use optimization to minimize boiler feed water and venting steam.
The following figure illustrates the refinery steam balance as constructed in AVEVA Process Simulation.