Maintenance by Downtime Interval Report
- Last UpdatedAug 18, 2025
- 2 minute read
The "Maintenance by downtime interval" report shows how many maintenance actions with downtime take place for each selected interval. The report for each period is shown separately on the next pages.
To open the report, first complete a window as previously with downtime by maintenance interval. Please refer to the explanation for Downtime by Maintenance Interval.
To print this simulation report, follow the steps below:
-
Open the module
Simulation -
Select a simulation on the left
-
Right click the model on the right
-
In the context menu, select the desired report:

-
To open the report, first fill in the Report settings:

The range is the period of hours entered in the input screen. The selected period is broken down into equal intervals by specifying the number of intervals.

-
In this example of part 'the bicycle', a range of 2 to 10 months is selected, divided into 8 segments. The simulation generates a range of 1 to 20 periods which may be shortened for opening the report.

Maintenance by Downtime interval

Maintenance by Downtime interval (follow up page)
Remark: If an object is selected on a level which is too low, the report function will not be available (greyed out).