Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA ™ Asset Strategy Optimization

Run the report

  • Last UpdatedNov 08, 2024
  • 1 minute read

Once a simulation model user report is updated via Reports management to Asset Strategy Optimization, you can run the report.

To run the report:

  1. Select a model in the Simulation screen.

  2. Right-click at the top level of the model and verify if the Production Loss value is provided in in the Properties grid.

    If no value is provided, then enter the Production Loss value for the selected simulation model.

  3. In the model hierarchy, select the level for which you want to use the report.

  4. From User Reports menu, select User Reports.

    The Show report window appears, displaying the report type selected in step 1 in the Report type pane.

  5. Select the report from the Report properties pane and select Show report to run the report.

    Asset Strategy Optimization now retrieves the data of the desired system or part from the database.

    Crystal Reports will display the report in a separate window. You can also examine the report in this window. This window is also used for printing and saving the report.

  6. Select Close to close the Show Report window.

TitleResults for “How to create a CRG?”Also Available in