Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA ™ Asset Strategy Optimization

Maintenance by Maintenance Interval Report

  • Last UpdatedAug 18, 2025
  • 2 minute read

The "Maintenance by maintenance interval" report shows how many maintenance actions take place for each selected interval. The report for each period is shown separately on the next pages.

To print this simulation report, follow the steps below:

  1. Open the module Simulation

  2. Select a simulation on the left

  3. Right click the model on the right

  4. In the context menu, select the desired report:

    Embedded Image (65% Scaling) (LIVE)

  5. To open the report, first fill in the Report settings:

    The range is the period of hours entered in the input screen. The selected period is broken down into equal intervals by specifying the number of intervals.

    In this example of part 'the bicycle', a range of 2 to 10 months is selected, divided into 8 segments. The simulation generates a range of 1 to 20 periods which may be shortened for opening the report.


    Maintenance per maintenance interval

    Maintenance per maintenance interval (follow up page)

    Remark: If an object is selected on a level which is too low, the report function will not be available (greyed out).

Related Links
TitleResults for “How to create a CRG?”Also Available in