Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA ™ Asset Strategy Optimization

How is FMECA used?

  • Last UpdatedFeb 13, 2023
  • 1 minute read
  • A way to choose the best design early in the design phase.

  • Create a fit-for-purpose design of equipment in greenfield situation to be used to prepare a maintenance strategy.

  • Perform early testing on new equipment based on a set of test criteria.

  • Provide a starting point for preventive and predictive maintenance strategies.

  • List possible failure modes of the system and how they affect the system condition related to a set of defined business goals.

Business goals can be related to increasing safety and reliability of equipment, but also to reducing downtime and optimize the production of the system.