Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA ™ Asset Strategy Optimization

Simulation reports

  • Last UpdatedMay 28, 2025
  • 1 minute read

Simulations deliver a lot of information, that can be inspected from different angles. A complimentary set of simulation reports present can be generated from the simulation screen.

As an general example, to select a report called Downtime per period, follow these steps:

  1. Open module Simulation

  2. Select a scenario in the list on the left

  3. Then right click the model on the right

  4. Choose a report, in this example: Downtime per Period as shown below

    Embedded Image (65% Scaling) (LIVE)

The various reports are discussed in detail in the following topics.

TitleResults for “How to create a CRG?”Also Available in