Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA ™ Asset Strategy Optimization

Costs by Period by Maintenance Strategy Report

  • Last UpdatedAug 18, 2025
  • 2 minute read

The "Costs by period by maintenance strategy" report gives an image of the costs incurred in each period broken down by maintenance strategy. The maintenance actions are shown for each strategy together with number, duration and costs. This gives a good overview of which costs are corrective and which are preventive. The report can be opened to part level. The results are shown by strategy, by period and by simulation.

To print this simulation report, follow the steps below:

  1. Open the module Simulation

  2. Select a simulation on the left

  3. Right click the model on the right

  4. In the context menu, select the desired report:

    Embedded Image (65% Scaling) (LIVE)

    A report similar to the one below will appear after some time:


    Costs by period by maintenance strategy Report



    Costs by period by maintenance strategy Report (follow-up page)

Diagram

The ratios between the costs by maintenance strategy are shown in the pie chart.

Report

The overview shows detailed information about the costs by period by maintenance strategy, such as number of failures and their costs.

FIELD

DESCRIPTION

Strategy

The maintenance strategies ordered by FBM, UBM, CBM and CBM follow-up are shown under strategy

Description

Description is the name of the maintenance strategy

Duration

Duration is the total maintenance time spent on the relevant maintenance strategy

Costs

The costs spent on the maintenance strategy are shown under Costs

Costs inc. ROI

The costs including ROI spent on the maintenance strategy

Remark: If an object is selected on a level which is too low, the report function will not be available (greyed out).

In This Topic
TitleResults for “How to create a CRG?”Also Available in