Costs by Period by Maintenance Strategy Report
- Last UpdatedAug 18, 2025
- 2 minute read
The "Costs by period by maintenance strategy" report gives an image of the costs incurred in each period broken down by maintenance strategy. The maintenance actions are shown for each strategy together with number, duration and costs. This gives a good overview of which costs are corrective and which are preventive. The report can be opened to part level. The results are shown by strategy, by period and by simulation.
To print this simulation report, follow the steps below:
-
Open the module
Simulation -
Select a simulation on the left
-
Right click the model on the right
-
In the context menu, select the desired report:

A report similar to the one below will appear after some time:

Costs by period by maintenance strategy Report
Costs by period by maintenance strategy Report (follow-up page)
Diagram
The ratios between the costs by maintenance strategy are shown in the pie chart.
Report
The overview shows detailed information about the costs by period by maintenance strategy,
such as number of failures and their costs.
|
FIELD |
DESCRIPTION |
|
Strategy |
The maintenance strategies ordered by FBM, UBM, CBM and CBM follow-up are shown under strategy |
|
Description |
Description is the name of the maintenance strategy |
|
Duration |
Duration is the total maintenance time spent on the relevant maintenance strategy |
|
Costs |
The costs spent on the maintenance strategy are shown under Costs |
|
Costs inc. ROI |
The costs including ROI spent on the maintenance strategy |
Remark: If an object is selected on a level which is too low, the report function will not be available (greyed out).