Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA ™ Asset Strategy Optimization

Total Downtime Report

  • Last UpdatedJun 05, 2024
  • 2 minute read

The "Total Downtime report" shows the totals relating to downtime. Here we find the total downtime, the total number of maintenance actions and the availability of the part for each maintenance strategy.

Availability = (no . of periods * simulation period - downtime (no . of periods * simulation  period) * 100%

Averages are also given next to each column. This is the result of the number in the previous column divided by the number of periods over which the simulation was performed.

To print this simulation report, follow the steps below:

  1. Open the module Simulation

  2. Select a simulation on the left

  3. Right click the model on the right

  4. In the context menu, select the desired report:

    Embedded Image (65% Scaling) (LIVE)

  5. A report similar to the one below will appear after some time:

    Embedded Image (65% Scaling) (LIVE)


    Total Downtime Report

    Remark: If an object is selected on a level which is too low, the report function will not be available (greyed out)

Related Links
TitleResults for “How to create a CRG?”Also Available in