Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA ™ Asset Strategy Optimization

Costs by Period by Maintenance Category Report

  • Last UpdatedJun 05, 2024
  • 2 minute read

The "Costs by period by maintenance category" report gives an image of the costs incurred in each period broken down by the maintenance category specified with the maintenance action. The maintenance actions are shown for each category together with number, duration and costs. The report can be opened to part level. The ratios are shown in the pie chart. The totals are shown by strategy, by period and by simulation.

To print this simulation report, follow the steps below:

  1. Open the module Simulation

  2. Select a simulation on the left

  3. Right click the model on the right

  4. In the context menu, select the desired report:

    Embedded Image (65% Scaling) (LIVE)

  5. A report similar to the one below will appear after some time:

    Embedded Image (65% Scaling) (LIVE)


    Maintenance Costs per Period by Maintenance category



    Maintenance Costs per Period by Maintenance category (follow up page)

    Remark: If an object is selected on a level which is too low, the report function will not be available (greyed out)

TitleResults for “How to create a CRG?”Also Available in