Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Production Management

Late-arriving data reprocessing

  • Last UpdatedOct 30, 2024
  • 2 minute read

Late-arriving data is data that relates to a record but is not available when the record is created or at the correct time. AVEVA Production Management enables you to include late-arriving data after the initial capture time, so that the data is included in the correct sample period.

When late-arriving data is input, AVEVA Production Management flags the record to which the data applies. Reprocess the record so that the correct information is calculated.

The ErrorLevel icon with tooltip displays next to late-arriving records in the Movement Events view. You can also view processing information in the Event editor.

Example 1: Late-arriving data with earlier timestamp than a survey result

In the first diagram the original balance of LOT1 is 90. A survey is performed on the lot, and an adjustment made that takes the balance of LOT1 to 100 to match the survey result.

Later, there is late arriving data of 20. This late arriving data is meant for a sample period in Time 2, but the data was not available at that time. If you do not reprocess this record, AVEVA Production Management follows the inputs in real time, which means the balance of LOT1 is 120.

This is incorrect as the input at Time 4, was meant for a sample period before the survey result. As the survey result is the correct balance of the lot, the correct final balance is 100.

Embedded Image (65% Scaling) (LIVE)

Example 2: Late-arriving data with same timestamp as a survey result

In the second diagram, a survey is performed on the lot, and an adjustment made which takes the balance of LOT1 to 100 to match the survey result.

Later, there is late arriving data of 20. This late arriving data has the same sample period as the survey result. When late arriving data has the same sample period as a survey result, reprocess the record, so that AVEVA Production Management calculates the correct balance to equal the survey result.

Embedded Image (65% Scaling) (LIVE)

Related Links
TitleResults for “How to create a CRG?”Also Available in