About Calculated Quality
- Last UpdatedApr 22, 2025
- 2 minute read
Calculated Quality takes source data from a Material Quality reporting point, typically associated with the same equipment as the Calculated Quality reporting point, and performs a calculation on the combined data contents of lot groups.
Important: The processing of Calculated Quality to estimate quality information is part of Inventory reprocessing. When a Quality record is updated (Quality event is created), both Material Quality and Calculated Quality records are not updated until Inventory reprocessing is complete.
Explaining Calculated Quality
Calculated Quality can perform a calculation on source data from a Material Quality reporting point to determine a quantity of material.
Example: Determining amount of ash present in a coal stockpile
-
Quality samples are taken when the coal is put onto the stockpile to determine the ash percentage.
-
The amount of coal being put onto the stockpile is recorded and used to derive a calculated inventory value for the quantity of ash that was added.
-
The calculated inventory values are used to weight the overall quality value that is assigned to the stockpile as a whole.
Aggregation type
Currently, the aggregation type for Calculated Quality is Weighted Average Quality (WAQ), which is calculated based on the qualities of lots in a lot group.
Weighted average quality is a method to determine quality of a material by means of the weighted average. Weighted average is a common type of mathematical average or mean. It is a mean that is computed with extra weight given to one or more elements of the sample. The weighted average produces a more accurate result than a regular average.
|
Quantity |
Quality |
Calculated Quantity |
Cumulative Balance |
Regular Average |
Weighted Average |
|---|---|---|---|---|---|
|
1000 kg ore |
0.05% gold |
50 kg gold |
1000 kg ore |
0.05% |
0.05% |
|
1000 kg ore |
0.10% gold |
100 kg gold |
2000 kg ore |
0.075% |
0.075% |
|
5000 kg ore |
0.20% gold |
1000 kg gold |
7000 kg ore |
0.116% |
0.164% |
|
3000 kg ore |
0.25% gold |
750 kg |
10,000 kg ore |
0.15% |
0.19% |