Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Production Management

View the Metrics R-bar chart

  • Last UpdatedApr 23, 2025
  • 1 minute read

You can use the R-bar chart in scenarios where you measure the output in terms of a variable such as height or weight. As with the X-bar chart, the R-bar chart only plots one point per configured samples series; however, the plotted value is the difference between the maximum and minimum value in the sample series. This type of chart is useful to determine if there are large changes in your KPIs while keeping the average at a certain level.

To view the Metrics R-bar chart

  1. Select Metrics on the Select Module panel.

  2. In the Location pane, select a location in the Plant hierarchy that contains a Metrics reporting point. The data in the results grid updates to reflect that location.

  3. In the Chart panel, select R-bar chart.

    Chart panel showing an R-bar chart that represents a selected record from the results grid.

    Chart options

    Option

    Description

    Fields

    Field to Chart

    Enables you to specify the KPI to chart.

    Any KPI.

    Sample Size

    Specify the number of KPI values for the statistical grouping.

    Sample size can be between 2 and 25.

Related Links
TitleResults for “How to create a CRG?”Also Available in