Selecting the type of installation
- Last UpdatedOct 10, 2023
- 1 minute read
Following points must be considered while installing AVEVA Work Tasks on the Load Balanced Server:
-
Ensure that you select the Complete Installation and Enable load balancing options.
-
You can either create a new Farm database or use an existing one.
-
In the Select the type of installation page, select Complete Installation (Server).
A Complete Standalone Deployment does not require a client installation.
-
Select the Enable load balancing (This feature requires and Enterprise license.) check box for installing AVEVA Work Tasks on the Enterprise Server.
The Farm Configuration Wizard dialog box appears.
-
Click OK.
-
To create a new Farm database, click Create AVEVA Work Tasks Farm, and then select one of the following:
-
Create AVEVA Work Tasks Farm database
-
Use existing AVEVA Work Tasks Farm database (Creates AVEVA Work Tasks Farm tables only if they do not exist)
-
-
To connect to an existing Farm database, click Connect to existing AVEVA Work Tasks Farm (if the first server of the Enterprise Server is already installed).
-
Click Next.
The Database User Settings page appears.