Move a Gateway Object, Workflows, and Associated Workflow Events
- Last UpdatedJun 10, 2024
- 1 minute read
In this scenario:
A Workflow Gateway Object (WorkflowGateway_002) is created and a Drum_Conveyor instance is created. The Drum_Conveyor instance uses the WorkflowGateway_002 to associate workflow event. The steps followed for this are given below:
-
Create a Workflow Gateway Object in the engineering environment and provision it to AVEVA Work Tasks Repository.
-
Create a Drum_Conveyor instance. Add Workflow Event and associate a workflow to it.
-
Save and deploy the Workflow Gateway Object and Drum_Conveyor instance. Trigger the workflow.
-
If everything is working as expected, access System Platform IDE in the engineering machine.
-
Select the WorkflowGateway_002 and Drum_Conveyor_002.
-
Select Galaxy > Export > Object(s).
-
Save the exported object in a disk. In addition, follow the steps 1-8 to export the workflow given in the above section Move only the Workflow.
-
Move exported objects (.aaPKG) and workflow (.xml) to the Production machine. Follow the steps given below.
-
Open the System Platform IDE of Production machine.
-
Go to Galaxy > Import > Object(s).
-
Select the .aaPKG file that was moved from the engineering to production machine.
-
After successfully importing, re-provision the WorkflowGateway_002 with the Repository in production server.
-
Save and deploy the WorkflowGateway_002.
-
Open the Drum_Conveyor_002 and click the Workflows tab.
-
Select the events you have created in the engineering environment. Click the Refresh button of the Workflow Gateway drop-down list.
-
Select WorkflowGateway_002 from the drop-down and click the Select button.
-
Click New Workflow and follow the steps given in "Move only the Workflow" (Steps 11 to 19).