Generate reports by meter list criteria
- Last UpdatedNov 18, 2025
- 2 minute read
You can generate Report formats based on other groupings within the AVEVA Measurement Advisor application.
-
Area Of Responsibility (AOR)
-
AOR Group
-
Object List
-
Station
-
Organization
Note: The Organization will determine the meters connected to the organization using the station connectivity, not the organization alias connectivity.

To generate a report by outlining meter list criteria
-
Select the desired object from dropdown list. For example, the Area(s) of Responsibility from which the report should be generated.
-
Select the Start and End Time and the other required parameters.
Note: If there is no time component specified in the Start Time or End Time fields, it is assumed that you want the date-times to correspond to the gas day. To specify a time for the report, use the Start and End Time drop down to set the date, and then enter the time in the text box in the following format: HH:MM:SS AM or PM.

-
Ensure that the other filters are left blank.
For the Meters dropdown list, this entails selecting the checkbox underneath Select All.

-
Click View Report.
To navigate between pages of a multi-page report, use the navigational arrows.