Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Measurement Advisor

Configure a Late data check on the meter properties

Configure a Late data check on the meter properties

  • Last UpdatedAug 25, 2025
  • 1 minute read
  1. Open the Properties window for your desired meter.

  2. From the Meter tab, scroll down to the MTR Late Data Check.

  3. Check Enable.

  4. From the Meter Frequency dropdown list, select the desired granularity of the estimated data.

  5. In the Maximum Estimations field, enter the maximum number of estimations that should take place as a result of this check. For more information, refer to Define the maximum number of estimations associated with a Late Data Check.

Related Links
TitleResults for “How to create a CRG?”Also Available in