Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Measurement Advisor

Historical range options

  • Last UpdatedNov 18, 2025
  • 1 minute read

The application fills the rows’ dates in the Historical Range Start/Stop fields in the Meter Estimation section.

Note: You can estimate multiple columns at once if they are all relying on the same estimation method.

Upon the completion of the estimation, the corrected volume and/or corrected energy variables are re-calculated, if appropriate.

Meter Data Editor Window — Historical Range Options

Button

Description

Set

Open the Select Date Range dialog and select the desired date range.

Highlighted

Select the highlighted selected rows in the Meter Data Editor window.

Minimum

Select the minimum rows required.

All

Select all the rows in the Meter Data Editor window.

Calc Avg

Calculate the average for the defined rows. This is used to calculate the average based on the last known values or to compensate for a large discrepancy in the data.

TitleResults for “How to create a CRG?”Also Available in