Rate of change (ROC) check
- Last UpdatedNov 03, 2025
- 1 minute read
The Rate of Change (ROC) Check determines whether a field has changed from the previous value by a configured amount (tolerance).
This validation includes the following for all meter types:
-
Volume
-
Energy
-
Pressure
-
Temperature
-
Flow Time
-
Run Time
-
Mass
-
Dewpoint
In addition to the common rate of change validations, each meter type has additional rate of change validations that can be applied, outlined on the <Meter Type> Validation tab for each type of meter. The table below outlines what rate of change validations are applied for each individual meter type.
|
Validation Field |
Pulse Meter |
Orifice Meter |
Corrector Meter |
Coriolis Meter |
|---|---|---|---|---|
|
Pulse Count |
Y |
Y |
||
|
Uncorrected Volume |
Y |
Y |
||
|
Uncompensated Mass |
Y |
|||
|
Differential Pressure |
Y |
|||
|
Flow Extension |
Y |