Configure properties for a measurement point
- Last UpdatedNov 24, 2025
- 2 minute read
-
Open the Measurement Point Summary window and select the desired point.
-
Do one of the following:
-
Select the desired row and select Properties.
-
Right-click the desired row and select Properties.
-
-
Edit the Application Type.
This opens the Point Application Type Summary.
-
Select the following icon (
) to provide the time the measurement point was commissioned, by providing the Commission Time.
-
Select the following icon (
) provide the time the measurement point was certified, by providing the Certification Time.
-
Select the following icon (
) to associate a Meter or Gas Quality with the Measurement Point.
The Connected Items window appears.
-
Selecting Edit allows you to select a new item in the Connected Items window.
-
-
To associate a Station with the Measurement point, select the following icon (
).
The Connected Items window appears.
-
Selecting Edit will allow you to select a new item in the Connected Item window.
-
-
Enter the Physical Run Number.
-
Enter the Sequence Number.
-
Select an Area of Responsibility (AOR) Group by selecting the following icon (
).
-
Select the associated Dataset by selecting the following icon (
).
-
Enter an adjustment reason.
-
Select Set.
-
Select Close.
-
Select Save.
Note: All properties can be made unavailable for editing by changing the permission levels associated with them. This is typically configured at installation time. For more information, speak to your Administrator.