Validate a row of data
- Last UpdatedSep 23, 2024
- 1 minute read
-
On the Meter Data Editor window, select the desired meter.
-
Right-click on the desired meter.
-
Select Validate.
Note: The application checks the data according to its validation configuration. If you do not select a row, AVEVA Measurement Advisor selects and validates the active row.