Define the maximum number of estimations associated with a Late Data Check
- Last UpdatedJun 17, 2025
- 1 minute read
It is possible to define the maximum number of estimations that will be completed for the Late Data Check.
To define the maximum number of estimations
-
On the Meter tab of the Properties for Meter window, under the MTR Late Data Check, select Enable.
-
From the Meter Frequency dropdown list, select the granularity of the estimated data.
The table below defines the actual length of the meter frequency granularity. The Meter Frequency granularity is the Tol value shown in the Late Data Check algorithm.
Meter Frequency Granularities
Item in dropdown list
Actual Length
Annual
365 days
Semi-Annual
186 days
Quarterly
93 days
Monthly
31 days
Weekly
7 days
Daily
1 day
Hourly
1.5 hours
15-minutes
30 minutes
-
Define the number of estimations that you want to take place as part of the Late Data Check.
-
Defining a minimum value of '0' will ensure that the Late Data Check produces estimated values continuously.
-
The maximum value that you can set is 10,000.
Note: If you rest on the Maximum Estimations in the Properties for Meter window, a tooltip appears indicating the minimum and maximum values that can be entered.
-
-
Select Save.
You are prompted to set an adjustment reason.
-
Select Close.