Configure a blowdown meter
- Last UpdatedSep 24, 2024
- 1 minute read
-
In the Data Source field on the Properties for Meter window: Manual Meter tab, select Blowdown Meter.
-
Select the Blowdown Meter tab.
The Meter Properties: Blowdown Meter tab appears.
-
Enter the appropriate information for the blowdown meter.
-
Select Save.
-
Select Close.