Tees and Crosses
- Last UpdatedJul 28, 2025
- 1 minute read
TEEs, OLETs and set-on Tees (stub ins) are represented by different symbols. The primary and secondary bore sizes of the tee are indicated by a message linked to the tee intersection point.
The branch pipe size is plotted against the third pipe leg.

Presentation of TEEs and OLETs
A reinforced set-on Tee will have the text REINFORCED added to supplement the plotted shape. See the Extra text for a reinforced set-on TEE image.

Extra text for a reinforced set-on TEE