Revision Details
- Last UpdatedJan 23, 2023
- 2 minute read
Sets the revision details for the isometric drawing.
When the Isometric drawing is created or updated, the issue number, date and author are set. Other details are not set, for example, the description or approval signatures.

To add details to the current revision, input the details in the fields as required.
Click Apply to update the drawing revision table or Cancel to discard any changes and close the Isometric Drawing Revision window.

To add a new revision, select an issue from the Rev drop-down list, add new details as necessary and click Apply. The drawing revision table updates to display all previous and new revisions.

To switch an Internal revision to an External revision you can either:
-
Update a drawing and modify the revision type (refer to Create and Compare Drawing Revisions for further information).
-
Modify the ADP revision settings, refer to Revision for further information.