Mining Work Area
- Last UpdatedJul 10, 2024
- 1 minute read
Many features of the Mining discipline user interface are common to multiple AVEVA E3D Design disciplines, with the exception of the functionality available for selection on the Mining tab.

Note: The Admin tab is available for selection only, if you a member of the MININGADMIN team.
Project tab
Provides access to a number of key commands and facilities, most of the functionality available for selection are common to multiple AVEVA E3D Design disciplines.
Mining tab
Includes the following functionality specific to the Mining discipline:
-
Create
-
Modify
-
Tools
-
Structure Storage
-
Section Defaults
PowerWheel™
Many operations in the Mining discipline can be initiated using the PowerWheel. The equivalent functionality is also available from the Mining user interface, all of the out of box configurations for the PowerWheel can be customized.
