Prepare the Site for Spool
- Last UpdatedFeb 14, 2025
- 1 minute read
The consistency of the data should have been checked before the model is sent for spooling. However, it is best practice to check that the design data in the design model is consistent and make any changes (inserting shop or field welds) to the design model that are obviously needed after inspection, before any spooling is carried out.
The Spool module does not operate correctly if there are errors in the consistency check, warnings do not affect the operation. Make sure the ZONE SPOOL-PIPE element in the Model Explorer is the Current Element (CE).

Refer to Data Consistency for further information.