Schedule Configuration Providers
- Last UpdatedFeb 10, 2025
- 2 minute read
Only a Tenant administrator with required System Permissions can modify the scheduling of Server Integration Configs created at the Tenant level.
-
Click the desired Registered Provider listing in the Configured Provider panel to select it.
Note:
- If the value of the [RequiresServerConfiguration] property is set to 0, then the registered provider will not appear in the Configured Providers panel. To know more about this property, see the AVEVA Mobile Operator Extensibility SDK guide.
- The list of registered providers in the Configured Providers panel appears depending on the Plant that you are logged in. -
Choose one of the following methods of data import by clicking the appropriate radio button:
-
Do not import data from this provider– Disables the selected provider, preventing updates from running.
-
Import every "X" minutes – Configures the provider to import on a recurring basis between 1 and 360 minutes.
-
Import on a specified day and time – Configures the provider to import at a specific time of day, one or more days a week.
Three read-only fields provide date and time stamps regarding the schedule for the selected provider:
-
Schedule Last Ran At: The date and time at which this schedule last ran.
-
Last Successful Run: The date and time at which this schedule last ran successfully.
-
Next Scheduled: The date and time at which this schedule will next run.
The "Override Schedule" button on this screen forces the import to run as soon as possible (usually within the next minute). This does not affect the schedule itself, and is provided to help ensure that imports will work properly on schedule.
Tip: It is recommended that you stagger the DTS Provider start times so as not to have them all start at the same moment. Separate start times by at least one hour.
-
-
Choose File→Save to save the configuration of this schedule.