Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Mobile Operator

Wonderware Online - Integration

  • Last UpdatedMar 15, 2018
  • 2 minute read

To integrate Wonderware Online with a task, drag the "Wonderware Online" icon from the Toolbox to the desired Task.

The "Wonderware Online Integration" item is selected, and the "Integration" section beneath opens to the General tab.

Wonderware Online Integration Attributes - General Tab

Configure the following options as necessary:

  • Integration Type: This displays the list of Integration Servers configured in the Wonderware Online Configurations. For more information, see the Server Integrations Configs section.

  • Title: This required field, limited to 150 characters, aids in the identification of this Integration.

  • Tag Name: Enter the Tag Name appropriate for this instance of the Integration. The names are not validated when processing the tags. If a tag name is not present, Wonderware Online creates a new tag with the name given.

    Note: The new tag takes the same data type as the associated task. It cannot be changed.

  • The bullets below these fields allow modification of the time-stamping options used for this instance of the integration. Select the option appropriate for your needs from the following.

  • Timestamp of Task: Uses the time at which input was last provided to the Task.

  • Fixed Timestamp: Uses a user-configured, fixed timestamp:

    Note: "Fixed Timestamp" uses the time at which input was last provided to the Task to determine the "current" date.

    Enter the desired time in the provided text field, and optionally a number of days to offset the timestamp into the past (where 0 is the current day, 1 is one day before the current day, et cetera).

  • Timestamp of Procedure Node: If applicable, the time input was last provided to the Task Group’s status question or Task’s question, or the last calculation evaluation of a Decision. Otherwise, the timestamp of the last time this Task Group was navigated away from.

  • Value of Selected Task: Uses the value of this task as the timestamp. This is only intended for Tasks that use an input type of "Datetime."

Related Links
TitleResults for “How to create a CRG?”Also Available in