Details - Procedure level
- Last UpdatedFeb 25, 2025
- 2 minute read
The Details section provides the following information when the Procedure Node is selected in the Procedure Tree.

-
Base: The Base to which the Procedure was assigned upon creation.
-
User: The name of the user (Lastname, Firstname, Login ID) who last closed the Procedure.
-
Partial Transfer: If checked here (as opposed to the config section), this Procedure was partially transferred.
-
Device: The name of the mobile application used to open and work the Procedure.
-
Started: The time the Procedure was opened on the mobile application.
-
Complete: The time the Procedure was marked Complete on the mobile application.
-
Transmitted: The time the Procedure transferred from the mobile application to the Sync Server.
Note: On the following three controls, the presence of a pencil icon (
) indicates that the control contains information. Each is expanded by clicking the
right-facing chevron (
) to reveal the information contained within.
-
Approval: If this Procedure has been marked Approved, this control may be expanded to display the following information:
-
Approval Date: The date and time this Procedure Instance was last marked "Approved" in Auditor Plus.
-
Approved By: The last, first, and login name of the User who last marked this Procedure Instance as "Approved."
-
-
Metrics: Expand this control to display the number of Total, and Answered, Nodes that were in the "Active and Expected," "Active," and "Inactive" states when this Procedure Instance was closed.
-
Signature: Expand this control to display the handwritten signature, if any, entered in order to close this Procedure Instance.