PI System
- Last UpdatedJul 01, 2022
- 1 minute read
To integrate AVEVA PI Systems with a task, drag the "PI Systems" icon from the Toolbox to the desired Task.

The "PI System Integration" item is selected and the "PI System Configurations" section beneath opens.