Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Production Management

View the Downtime Pie chart

  • Last UpdatedApr 14, 2025
  • 1 minute read

A Pie chart is a way to summarize a set of categorical data or display the different values of a given variable (for example, percentage distribution). This type of chart is a circle divided into segments, and each segment represents a particular category.

The area of each segment is the same proportion of a circle as the category is of the total data set. Pie charts usually show the component parts of a whole.

To view the Downtime Pie chart

  1. Select Downtime on the Select Module panel.

  2. In the Location pane, select a location in the Plant hierarchy that contains a Downtime reporting point. The data in the Results grid updates to reflect that location.

  3. In the Chart panel, select Pie chart. For more information of the chart options, see Downtime Pie chart options.

    Production Analyst Chart panel showing a Pie chart for Statistics of Cause Location.

TitleResults for “How to create a CRG?”Also Available in