Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Production Management

Movement types

  • Last UpdatedSep 05, 2023
  • 1 minute read

You can add material movements for the following movement types:

  • Input - Material enters the process (there is no source equipment). AVEVA Production Management adds the following records:

    • One Movement record.

    • One Material Flow record at the destination equipment.

  • Output - Material leaves the process (there is no destination equipment). AVEVA Production Management adds the following records:

    • One Movement record.

    • One Material Flow record at the source equipment for each lot of material being moved.

  • Internal - Material moves from a source equipment to a destination equipment. AVEVA Production Management adds the following records:

    • One Movement record.

    • One Material Flow record at the source equipment for each lot of material being moved.

    • One Material Flow record at the destination equipment.

TitleResults for “How to create a CRG?”Also Available in