How to set up Planning

  • Last UpdatedSep 22, 2022
  • 1 minute read

These are the basic steps for setting up Planning.

1

Prepare for Planning

Before you add a Planning reporting point, do the following:

  • (Optional) Define your products in the product hierarchy.

  • (Optional) Add and configure any stored variables.

2

Add Planning reporting points

You can place Planning points to associate them with pieces of equipment.

3

Define actions

This important step gives directives to the plant equipment. You can upload directions to machines through connectors or through stored variables.