Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Production Management

Genealogy process example

  • Last UpdatedDec 01, 2022
  • 2 minute read

The following is a high-level process diagram of a Coal supply chain. It shows how material flows from the mines and is shipped to customers. There are three primary sites. Mine A, Mine B, (both include their CHPPs) and the Port.

High-level genealogy process workflow diagram showing how material flows from the mines and is shipped.

At a more detailed level, feed is delivered to the ROM by trucks and is fed into ROM Bins at each CHPP. The CHPP converts feed into Product and places it onto stockpiles. Product is moved from the stockpiles into a Train Loadout Bin and then loaded onto trains. The Trains are unloaded onto a stockpile, which is then loaded onto a vessel. A customer has requested to know the Ramp/Strip/Block details of the product that was loaded onto vessel VES456-20100405. The user would launch the Genealogy Wizard, and specify a starting filter of Vessel = VES456-20100405, to find related lots that meet a final filter of Location is Mine A or Mine B.

Results

The answer results in the following screen.

Genealogy Results window showing a selected record and below it is a visual overview of the path that material traveled.

In This Topic
Related Links
TitleResults for “How to create a CRG?”Also Available in