About Planning
- Last UpdatedMar 17, 2025
- 2 minute read
Planning bridges the gap between the Enterprise Resource Planning (ERP) system and the plant floor. Planning provides production supervisors and planners with tools for achieving the most efficient use of the available plant, equipment, and resources. This includes activities such as:
-
Scheduling production orders
-
Planned maintenance activities
-
Standby periods
What it means for production planners
-
Production Planners and Schedulers can visualize production plans and optimize local schedules independently of the ERP system.
-
Maintenance Managers can see that the production schedule accounts for important maintenance tasks (that may require a plant stoppage).

Planning with Recipe
You can use Planning alone, or with the Recipe extension.
The Recipe plug-in is available which provides support for implementation of the S.88 Batch Control standard. With Recipe, you can create and maintain recipes in AVEVA™ Production Management and download parameters to plant automation systems when you execute the recipe.
How does AVEVA Production Management manage Planning data?
AVEVA™ Production Management manages the display of Planning data through the following components.
|
Possible actions include TagDownloads and RecipeDownloads. |
|
|
Enables you to configure validation on data records to determine whether they meet criteria. |
|
|
A Planning field defines the information to capture for a Planning record. |
|
|
An evaluated field can combine the values of other fields. |
|
|
A Planning record can transition through different states that indicate the current status of the record. |
Related topics
In This Topic
Related Links
- How to set up Planning
- About Conformance to Plan features
- About Match Movements to Plan
- About material requirements
- Planning workflows
- Add and configure a Planning record state
- Planning record state properties
- Add and configure Planning transition state
- Planning custom transition state properties
- Add and configure a Planning state transition
- Planning state transition item properties