Energy Pareto chart options
- Last UpdatedSep 25, 2023
- 1 minute read
Refer to the following table for the available options in Energy Pareto chart.
|
Option |
Description |
Fields |
|---|---|---|
|
Aggregate |
Change which field is being totaled. |
Duration, Effective Duration, and any numeric custom field. |
|
Group By |
Group records by different fields. For example, you can show the downtime event durations by team or by cause location. |
Custom fields where the FieldType property is ID, and the DataType property is String. |
|
Order By |
Control whether the summation or count is more significant, and then orders the columns in the chart accordingly. |
Duration or Count. |
|
Display |
Control whether the chart displays the Equipment ID or the full path on the x-axis. |
When grouping by Location or Cause Location. |
|
Show |
Control how many columns are on the chart. |
All of them, Top 1, 2, 3, 4, 5, 10, or 15. |
|
Include ‘others’ |
The option to "Show X" displays a column (on the far right) that constitutes the ‘rest’ of the downtime events. |